1
2
3
4
 

Port charges

  1. Pilotage
    http://www.portgdansk.pl/shipping/port-services

  2. Towage
    http://www.portgdansk.pl/shipping/port-services

  3. Mooring
    http://www.portgdansk.pl/shipping/port-services

  4. Fire-fighting assistance

    Fire-fighting ship assistance and an pneumatic oil barrier – 134 $/h
    Launching an floating oil barrier – 44 $/h

  5. Tonnage dues

    The tonnage dues for maritime trade vessels for the port entry, port exit, transit through the port area and waste reception for recycling or disposal for one GT are as follows:

    Fuel tankers up to 38 000 GT  - 0,57 EUR
    Fuel tankers over 38 000 GT  - 0,64 EUR

  6. Wharfage

    1. On the basis of article 8 section 2 item 2 and sections 4, 4a and 4b of the Port and Marina Act issued on the 20th December 1996 (consolidated text – Journal of Laws no. 110 item 967 of 18-07-2002 as amended) the berth charges for the port berths owned by the NAFTOPORT Oil Terminal used by tankers have been established as follows:
    1.1 Using the Naftoport Oil Terminal berth by the tanker – EUR 0,08 per 1 GT
    2. The charges set in point 1 are used for the time of loading and the first four hours afterwards.
    3. The charges are made by the Port of Gdańsk Authority.

  7. ISPS Charges

    Due to the introduction of ISPS security measures in NAFTOPORT, ISPS charges have been established for the usage of ISPS system in the amount of EUR 0,04 per 1 GT payable by each tanker on the entrance to the Basin 1 and Basin 2, and by other vessels on the entrance to Winter Basin, but not higher than EUR 3000 for a ship.